| Unit Code |
Unit Title |
| PLB-06 |
Install and Maintain Gas Piping Systems |
Nominal Hours: 30
Unit Descriptor:
Covers installation, testing, and maintenance of gas piping systems (regionally applicable).
Elements | Performance Criteria
| Elements |
Performance Criteria |
| 1. Plan gas piping installation |
1.1 Interpret plans and codes.
1.2 Select pipes, valves, and fittings.
1.3 Lay out system for installation. |
| 2. Install gas piping systems |
2.1 Cut, join, and fit pipes and fittings.
2.2 Install valves, regulators, meters.
2.3 Ensure correct pressure and support. |
| 3. Test and maintain gas systems |
3.1 Perform leak and pressure tests.
3.2 Inspect for leaks, corrosion, or faults.
3.3 Repair or replace components as needed. |
Range of Variables
| Variables |
Range |
| Materials |
Steel, copper, CSST, PE (as permitted by code). |
| Fittings |
Valves, unions, elbows, tees, regulators, meters. |
| Testing |
Soap test, pressure test, leak detection, visual inspection. |
Evidence Guide
| Area |
Details |
| 1. Critical aspects of competency |
Installs, tests, and maintains gas piping systems to code. |
| 2. Underpinning knowledge |
Gas principles, materials, installation standards, safety, testing. |
| 3. Underpinning Skills |
Pipe joining, valve installation, leak testing, troubleshooting. |
| 4. Underpinning attitudes |
Safety, compliance, attention to detail, responsibility. |
| 5. Resource Implications |
Gas piping materials, tools, test equipment, plans. |
| 6. Methods of Assessment |
Practical demonstration, inspection, questioning, supervisor feedback. |
| 7. Context of Assessment |
Real/simulated site with gas piping installation and testing. |
Foundation skills
| Skills |
DESCRIPTION |
| Numeracy |
Measure, calculate pressure, pipe lengths. |
| Problem Solving |
Diagnose and repair leaks or pressure issues. |
| Planning/Organizing |
Sequence installation and testing tasks. |
Target Audience
| Target Audience |
Description |
| Plumbing apprentices, workers |
Individuals installing and maintaining gas piping systems. |
Recognition of Prior Learning (RPL)
Pre-Requisit